-- card: 41471 from stack: in -- bmap block id: 41608 -- flags: 0000 -- background id: 3633 -- name: The Critical Path 2 -- part 45 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 46 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=352 top=102 right=165 bottom=462 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: callout -- part 47 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=304 top=241 right=267 bottom=401 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: callout -- part contents for background part 6 ----- text ----- MacProject II shows the critical tasks with drop shadows and the lines between them in boldface in the Schedule Chart and with boldfaced type in the Project Table. If you -- part contents for background part 7 ----- text ----- have a color device, it uses red to show critical path in the Schedule Chart, Project Table, and timeline charts. -- part contents for background part 27 ----- text ----- Schedule Information -- part contents for background part 28 ----- text ----- The Critical Path -- part contents for card part 45 ----- text ----- 2 of 2 -- part contents for card part 46 ----- text ----- Slack is shown in the lower-right corner of these boxes. Note that this critical path has no slack. -- part contents for card part 47 ----- text ----- The noncritical path has 7 days of slack.